The appeal is obvious: endless hot water, 15 to 20 years of service instead of 8 to 12, and a wall-mounted unit that gives back the floor space a tank occupied. The catch is that a tankless heater asks more of the house than a tank does. Homeowners in Columbus converting from a tank usually find the unit itself is only 30% to 50% of the bill.
A gas tankless unit typically needs the gas line upsized from half-inch to three-quarter, since it draws far more fuel in bursts than a tank ever did; that’s $350 to $2,000. Old tank venting can’t be reused; direct venting adds $100 to $600. An electric whole-home unit avoids gas work but can draw 28 kW or more, which often means a 200-amp panel upgrade at $1,500 to $4,000. Total installed cost lands between $1,400 and $5,600 in most cases.
Sizing runs on two numbers: peak simultaneous flow in gallons per minute, and temperature rise the gap between incoming groundwater and your target of about 120°F. Those interact. A unit rated 5 GPM at a 35-degree rise delivers closer to 3.2 GPM when the incoming water is 40°F. In colder regions, that math often rules out electric for whole-home use. Two showers and a sink is roughly 5.5 GPM. Water heater installers in Columbus should run this calculation before recommending anything.
Permits and inspections apply almost everywhere, and gas work often requires a specific gas license beyond a plumbing one. Plan on annual descaling at $100 to $350 more often in hard water, where scale in the heat exchanger is what kills these units early. Below you’ll find licensed plumbers handling tankless water heater installation in Columbus, tank-to-tankless conversion, gas line and venting work, and descaling service. Get three itemized quotes and confirm each covers permits, venting, and any gas or electrical upgrades.
Most installs run $1,400 to $5,600 all in. Electric units land at $1,400 to $3,000; gas units at $2,100 to $5,600. Labor alone is $600 to $2,500 for three to ten hours of work. Prices sit in these ranges. The extras drive the spread: gas line upsizing $350 to $2,000, new venting $100 to $600, electrical panel upgrade $850 to $4,000, and old unit removal up to $500. Permits and inspection fees are usually quoted separately on top of that.
Two numbers decide it: peak simultaneous flow in GPM and temperature rise. Add up fixtures you’d run at once: two showers and a sink is about 5.5 GPM. Then subtract your coldest incoming groundwater temperature from 120°F. That gap matters more than people expect: a unit rated 5 GPM at a 35-degree rise drops to about 3.2 GPM at a 50-degree rise. Have installers run the calculation rather than sizing off house square footage. Undersizing produces cold water bursts.
Gas for whole-home use in most cases. Gas units deliver 5 to 11 GPM and work in any climate; electric tops out around 3 to 5 GPM and struggles where incoming water runs cold. Electric costs less to install when the panel has capacity, no venting, and no gas line. But a 36 kW electric unit draws roughly 150 amps at 240V, which many older panels can’t support. Plumbers should check panel capacity before quoting an electric unit at all.
Because the infrastructure changes. A tank sips gas slowly; a tankless unit fires hard on demand, so the half-inch gas line that fed the tank usually needs upsizing to three-quarter inch, $350 to $2,000. The old vent can’t be reused either, since tankless units require sealed direct venting at $100 to $600. Electric conversions may need a panel upgrade instead. The cheapest tankless install is a like-for-like swap. Plumbers price conversions accordingly, so ask for the itemized breakdown.
A like-for-like tankless swap takes three to four hours. A standard tank-to-tankless conversion runs five to six hours, including removal, plumbing changes, and venting. Complex jobs with gas line upsizing, panel work, or difficult vent routing take seven to eight hours or stretch into a second day. Permit review happens before any of it. Most plumbers can schedule the work within a week, but inspection follows on a separate visit. Plan for a day without hot water.
Yes, and skipping it is what kills them early. Annual descaling costs $100 to $350 and flushes mineral scale out of the heat exchanger. In hard water areas above roughly 7 grains per gallon manufacturers often specify every 6 to 12 months, and neglect can void the warranty. A water softener helps considerably. Beyond that, the inlet filter needs cleaning and the venting checked. Plumbers often sell annual maintenance plans covering all of it. Ask what’s actually included.
It depends on how long you’re staying. Tankless units use 24% to 34% less energy for low-usage homes and last 15 to 20 years versus 8 to 12 for a tank, so break-even typically arrives around year eight to ten. Past that, the savings are real. If you’re selling within five years, a conventional tank usually makes better financial sense. Ask plumbers to quote both a tank and a tankless so you can compare real numbers for your house.
Search your nearby area for the service man
Search your nearby area for the service man
Search your nearby area for the service man
Joel and his team went above and beyond to make sure they helped us fix the gas leak. Joel is a man of his word and came through on his promise.
Very expensive. Make sure you establish the price up front. They did some work on gas pipes, which was specialized so the prices weren't so horrible.
They did a good job and came quickly. Installed a bidet in my toilet. Shout out to Casey for the quality work.
Scheduled service for a clogged toilet and never showed. No call, all messages unanswered
If its an easy fit sure they maybe great but if its something different then quoted they are going to charge you either way a hefty price.
They never called my property manager, or myself, to ask if they could do an additional estimate while at my property. I was shocked. Companies cannot go around doing estimates.
Mike showed up in an hour to shut off a spigot that I could not shut off. Always great friendly service at a reasonable price!!!
Joel and his team went above and beyond to make sure they helped us fix the gas leak. Joel is a man of his word and came through on his promise.
Very expensive. Make sure you establish the price up front. They did some work on gas pipes, which was specialized so the prices weren't so horrible.
They did a good job and came quickly. Installed a bidet in my toilet. Shout out to Casey for the quality work.
Scheduled service for a clogged toilet and never showed. No call, all messages unanswered
If its an easy fit sure they maybe great but if its something different then quoted they are going to charge you either way a hefty price.
They never called my property manager, or myself, to ask if they could do an additional estimate while at my property. I was shocked. Companies cannot go around doing estimates.
Mike showed up in an hour to shut off a spigot that I could not shut off. Always great friendly service at a reasonable price!!!
Want a quote from ?